Auto & Vehicle planning

EV Charging Taper Timeline

Translate an observed or planned piecewise charging-power profile into energy and elapsed time.

Enter measured or assumed values

Method and units

For each SOC band, energy = pack capacity × band width ÷ 100. Time = band energy ÷ the entered average power × 60. Only the part of each band between start and end SOC is included.

Worked example

A 60 kWh pack from 20% to 80%, with 100 kW from 20–50% and 60 kW from 50–80%, needs 18 + 18 = 36 kWh and takes 10.8 + 18 = 28.8 minutes.

Supported inputs and interpretation

Capacity 1–300 kWh; SOC 0–100%; bands strictly increase; powers 0.1–500 kW. Results are rounded for display only; internal calculations retain full JavaScript precision. Entered measurements and assumptions determine the answer.

References and limitations

The equations here use the stated unit conversions and geometric or accounting relationships; no empirical vehicle limits or manufacturer presets are supplied.

Power bands are your own measured/assumed averages, not a vehicle or charger specification. This does not model temperature, conditioning, station sharing, losses, taper behavior within a band or the vehicle's charge limits.

Related calculators

This planner performs the stated arithmetic; it is not a vehicle inspection, engineering approval, manufacturer's recommendation or professional review.

Creator & reviewers

Creator persona

Reviewer personas

These names are pseudonymous editorial personas used to organize Northstar's work, not separate verified contributors. Reviewer assignments describe editorial responsibilities, not completed independent reviews or professional credentials. About our editorial personas.